Hotel Cooling Tower Replacement in South Florida

Ask any hotel engineer in South Florida what keeps them up at night in August, and the cooling tower will be near the top of the list. When the tower struggles, the chillers struggle, and when the chillers struggle, guests feel it in their rooms, the lobby and the ballroom. Then the complaints start.

Cooling towers in our climate work hard. Heat, humidity, salt air near the coast and long run hours all take a toll. Sooner or later every tower reaches the point where patching it no longer makes sense. Here is how we look at cooling tower replacement for hotels and resorts across Broward, Palm Beach and Miami Dade.

A tower rarely fails all at once. It usually tells you it is getting tired.

The basin, the casing or the piping keeps getting patched, and new leaks show up anyway.

Rusted structure, flaking metal and damaged hardware, especially on older galvanized towers near the water.

A tower that drifts, splashes or leaks wastes water and treatment.

If the tower cannot bring the water temperature down on hot afternoons, the chillers work harder and use more power.

If several of these sound familiar, it is time to compare the cost of keeping the tower going against the cost of replacing it. We wrote more on that choice in our

A hotel cannot shut off its cooling for a week while a tower gets swapped. Guests are checking in every day. Meeting rooms are booked months ahead. Restaurants and kitchens need to stay comfortable. So the replacement plan has to start with one question. How do we keep the building cool while the work happens?

On some jobs, a temporary tower or rental equipment keeps the chillers running while the old tower comes out and the new one goes in. On others, a hotel with more than one tower can run on the remaining cells while one is replaced at a time.

The best time to replace a tower is when the cooling load is lowest and the occupancy calendar allows it. In South Florida that window is short, so planning needs to start well before the work.

Cranes, noise and crews on the roof all need to be planned around the guest experience. Crane lifts are often scheduled early in the morning, and staging areas are kept away from guest entrances and pool decks where possible.

A cooling tower replacement is more than setting a new box on the roof. A good job covers:

The new tower should match the actual cooling load and the chillers it serves, not just copy the old nameplate.

The roof or pad, the supports and the dunnage have to be checked for the new tower's weight and footprint.

Condenser water piping, valves and controls get tied in so the tower and chillers work together.