Skip to content
Blog

ALF Chiller Replacement in South Florida

Chiller Replacement for Assisted Living Facilities in South Florida

In an assisted living facility, cooling is not a comfort item. Older residents are more sensitive to heat, many take medications that make it harder for the body to cool down, and a hot building in a South Florida summer can turn into a health problem in a matter of hours. If your facility runs on a chiller and that chiller is getting old, planning its replacement before it fails is one of the most important things you can do.

We work on chillers, cooling towers and the electrical that feeds them across Broward, Palm Beach and Miami Dade. Here is what ALF owners and administrators should know.

Chillers in South Florida run most of the year, so they wear out faster than in cooler places. These are the signs we look for:

It uses an older refrigerant like R 22 or R 123 that is being phased out and getting expensive.

Tube leaks, compressor problems or control failures keep coming back.

Energy bills keep climbing even though nothing in the building changed.

One of these alone does not always mean replacement. Several together usually does.

When a chiller fails in an office building, people go home. When it fails in an ALF, the residents are home. Florida's rules for assisted living facilities already require an emergency power plan that keeps the building at a safe temperature, and the state takes heat in these buildings seriously. A chiller failure in July is the worst time to start shopping for equipment, because lead times on large chillers can run months.

Planning ahead lets you pick the right equipment, line up temporary cooling, get permits approved and schedule the work in the cooler months when the load is lower.

The chiller is only one part. Pumps, the cooling tower, piping, valves and controls all need a look. Replacing the chiller and leaving a tired cooling tower in place often just moves the problem.

Many older chillers were sized for a building that has changed since. A load review tells you whether the new unit should be bigger, smaller or split into two machines for backup. Two smaller chillers can keep part of the building cool if one goes down, which is worth a lot in an ALF.

For most facilities, the residents stay in place during the work. That means a rental chiller, a staged changeover or doing the swap during a mild stretch of weather. This has to be worked out before the old unit is disconnected.

Chillers are big. We check the rigging path, crane access and any structural or roof work needed before ordering.

A new chiller often has different electrical needs than the old one. The feeders, the starter or drive and the disconnect may all need to change. If the chiller or part of the cooling plant is on the generator, the new load has to fit what the generator can carry and still meet the facility's emergency power plan.

This is where it helps to have one contractor for both trades. We hold an HVAC license (CAC1825204) and an electrical license (EC13006438), so the mechanical and electrical sides are planned together instead of discovered at startup.

Need this looked at on your building?

Call the Sunrise office or send the address. We will tell you what we see.