Florida ALF Generator Requirements: What Owners Must Do
Florida ALF Generator Requirements and What Owners Need to Do
Every assisted living facility owner in Florida knows there is a generator rule. Fewer know exactly what it says, and that is where we see trouble. The rule is specific, it gets checked, and the penalties go all the way to losing the license.
The rule came out of Hurricane Irma. In September 2017 a nursing home in Hollywood lost its air conditioning after the storm, and a dozen residents died in the heat. The state moved fast. Emergency rules went out that fall, and in March 2018 the Legislature ratified permanent rules for nursing homes and for assisted living facilities. The ALF rule started as 58A-5.036. Today it lives at Rule 59A-36.025 of the Florida Administrative Code.
Here is what it actually requires, in plain terms, and what we tell ALF owners in Broward, Palm Beach and Miami Dade to do about it.
Your facility needs an alternate power source, kept on site, that can hold the air temperature at or below 81 degrees Fahrenheit for at least 96 hours after you lose utility power.
You do not have to cool the whole building. The rule lets you pick an area or areas big enough to keep residents safe, as long as you plan at least 20 net square feet per resident. You are allowed to count 80 percent of your licensed beds when you do the math. So a 100 bed ALF plans for 80 residents, which means at least 1,600 net square feet of cooled space. That is a floor, not a target. If your residents need more room, plan more room.
The rule does not tell you what equipment to use. A generator that runs a few rooftop units, a generator that carries the whole building, a natural gas unit, a diesel unit: all of those can work. What matters is that the plan says what you are using and proves it can do the job.
When a state of emergency is declared that could affect power, you have to secure the full 96 hours. Portable containers are allowed for the extra fuel. Piped natural gas counts as meeting the on site fuel requirement, which is one reason a lot of facilities go with gas units.
If local rules cap how much fuel you can store, your plan has to show the most you can legally keep and a reliable way to get more at least 24 hours before you run out. "We will call the fuel company" is not a reliable way. After a storm, every fuel truck in South Florida is spoken for.
The generator gets the attention. These items get the citations:
• Maintenance and testing. The rule requires you to have services in place to maintain and test the equipment. That means a contract and records, not a technician you call once a year.
Carbon monoxide alarm. Required. Running a generator near a building without one is how people get hurt.
• Written policies and procedures. Staff have to be able to start, run and fuel the system right away. The procedures also have to cover cooling devices, ice and medication refrigeration, wellness checks for heat injury, and getting residents emergency medical help.
• Copies on site. The approved plan and the procedures have to be produced immediately on request, paper or electronic.
The plan is a supplement to your Comprehensive Emergency Management Plan, and it goes to your county emergency management agency for review and approval. Within 30 days of approval you send proof to AHCA. You also owe written notice to residents and their representatives when you first submit the plan and again when it is implemented.
The part that catches owners off guard: if you renovate, add on, or change systems in a way that affects compliance, you have to amend the plan, resubmit it, and implement the amended plan along with the work. Swapping a generator, adding a wing, or replacing the rooftop units that the generator feeds can all trigger it.
